Work continues on the drainage project. The concrete is done on the 3 sloped sides and will continue in the middle section.

Drainage Project Progress
April 18, 2018
April 18, 2018
Work continues on the drainage project. The concrete is done on the 3 sloped sides and will continue in the middle section.